-
Use and maintenance of water well drilling rig during run-in period 1. As construction machinery is a special vehicle, operators should receive training and guidance from the manufacturer, have a full understanding of the structure and performance of the machine, and obtain certain experience in operation ...
-
[Water Well Drilling Rigs Supplier]Does engineering rig also have run-in period? Water Well Drilling Rigs Supplier shares that after the construction machinery leaves the factory, it is generally stipulated that there is a run-in period of about 60 hours (sometimes called run-in period), which is stipulated by the ...