Because the activity system of the pocket equipment is different from any type of operating state as well as the operating attributes of each device, it is separated into three components, a revolving system, a circulation system, and a flow system. In this way, it is entirely configured as a system.
(1) The open gas, liquid, and also pipes are secured as necessary, and the inside of the network and also the joints are kept clean to stop contaminant from entering.
(2) When eliminating the fastener, please clamp the clip, attach a label or place it in a unique box.
(3) Separately packaged spirals and also spirals are packed independently to stay clear of mixing high-strength spirals, various other spirals as well as spirals.
(4) If the software program of the air system is degreased, the trouble of the water well rig is to cleanse the plastic packaging by tightening the outside of each tube, scuffing the screws as well as keeping them within the tube clean.
(5) Beware not to damage the equipment when dismantling or hanging.
(6) When put in a remote location or long-term storage space, it is exempt from rain, wetness, anti-fouling, prepared for packaging, as well as all set for product packaging and also product packaging.
(7) All liquids (oil, water) in the equipment are utilized to dry out the emissions.
What are the steps to set up a water well rig?
1. Firstly, make sure that the installment of the water well drill rig should be executed by a skilled operator, which an individual is in charge of the order.
2. Secondly, prior to establishing the installment of the water well rig, the topography, geology, hydrology, weather forecasting, and also flooding water level ought to be explored.
3. According to the water well drilling rig at the horizontal website, the installation needs to set up the drilling rig base, tower body, ground anchor, and so on.
4. Squash a strong part alongside the planned orifice, the location should not be less than 53.3 m2, the front of the wellhead may be uneven, yet there should be no barriers over 1m.
5. When the hydraulic water well drilling rig is mounted with a ground beam, the diesel motor transmission gadget, as well as the hoist, are fixed on the drilling rig base.

How can water well drilling rigs increase productivity?

1. After the drill bit of the hydraulic water well drilling rig is drilled into the structure, the center drilling tool needs to be replaced in time. First, you need to clean the bottom of the hole, and then blow away the residue at the bottom of the hole. When the drill bit stops rotating, the drill bit is drilled on the hydraulic water well drilling rig. It is most suitable for the situation where the lifting force rises slowly and the lifting force is just enough to lift the drill bit.

2. The drilling technology of hydraulic water well rig is summarized. It is also necessary to pay close attention to the follow-up work of the casing, understand the specific situation of the wellbore in time, clean the wellbore in time, and drill the bit on the water well drilling rig. During this process, strong lifting is strictly prohibited.

3. At the bottom of the hydraulic water well rig, there will be more residues. The eccentric drill bit will be jammed by the slag, which affects the collection and production of the slag. At this time, compressed air needs to be sent to clean the holes again. Make the down-the-hole hammer work in a short time, then model the water well rig, and then carry out the hoisting work of the center drilling rig.

Water Well Drilling Rig